Deliverables

D1.1 – Readiness for real-site monitoring report
D1.2 – Preliminary design
D2.1 – Wind simulation model & wind assessment results database
D3.1 – Progress achieved in WP2 and WP3
D3.2 – Rotor prototype
D3.3 – Final rotor design
D4.1 – Preliminary algorithms
D4.2 – Final algorithms and results of the lab testing of the power electronics
D4.3 – Prototype of power system
D5.1 – WINDUR prototype
D5.2.Prototype Testing (Procedures & Results)
D5.3 – Final WINDUR prototype
D6.1 – Roof top installed prototype
D6.2. Performance testing & cost analysis
D7.1_WINDUR project website
D7.2_Highlights for the first reporting period
D7.3_Interim plan for the use and dissemination of the knowledge
D7.4 – Final plan for the use and dissemination of the knowledge
D7.5_WINDUR dissemination kit
D8.1 – Consortium agreement