Deliverables

D1.1 – Readiness for real-site monitoring report: this deliverable is confidential and will not be available here.
D1.2 – Preliminary design: this deliverable is confidential and will not be available here.
D2.1 – Wind simulation model & wind assessment results database: this deliverable is confidential and will not be available here.
– results of the wind measurement campaign: report download
– results of the wind measurement campaign: database
D3.1 – Progress achieved in WP2 and WP3: this deliverable is confidential and will not be available here.
D3.2 – Rotor prototype: this deliverable is confidential and will not be available here.
D3.3 – Final rotor design: this deliverable is confidential and will not be available here.
D4.1 – Preliminary algorithms: this deliverable is confidential and will not be available here.
D4.2 – Final algorithms and results of the lab testing of the power electronics: this deliverable is confidential and will not be available here.
D4.3 – Prototype of power system: this deliverable is confidential and will not be available here.
D5.1 – WINDUR prototype: this deliverable is confidential and will not be available here.
D5.2 – Prototype testing (procedures and results)
D5.3 – Final WINDUR prototype: this deliverable is confidential and will not be available here.
D6.1 – Roof top installed prototype
D6.2 – Performance testing and cost analysis
D7.1_WINDUR project website
D7.2_Highlights for the first reporting period
D7.3_Interim plan for the use and dissemination of the knowledge
D7.4 – Final plan for the use and dissemination of the knowledge
D7.5 – Dissemination kit
D8.1 – Consortium agreement: this deliverable is confidential and will not be available here.